We periodically post the work of Anderson students and alumni. Kevin Sheward recently graduated from Anderson University with a BA in Political Science and a minor in non-profit leadership. He plans to pursue his MBA from Anderson University this fall. His professional interests include urban development and disaster recovery, with a personal interest in alternative energy.
Wind Energy: A Change in Public Opinion
Kevin Sheward
The United States has been a leader in many different areas of technology in innovation during its history, but one area that it has been a follower is in alternative energy incorporation. As a nation we have been successful thus far relying on fossil fuels to power our nation, but times are changing and as the environmental and health impacts of burning these fossil fuels are becoming better understood, there is a growing sense that we need to find cleaner and more advanced ways of powering our growing energy needs. Wind energy is one of the promising options that could be the replacement for fossil fuels in the future, but unfortunately it has faced an uphill battle.

The first wind farm was built in the Netherlands in the 1890’s but it wasn’t until 1980 at Crotched Mountain New Hampshire that the first wind farm was built on U.S. soil. It took the United States almost a century to implement a viable energy option that Europe was proving successful for decades. The reason for this is multi-faceted. Until the oil crises of the 1970s, oil and natural gas were extremely cheap energy options and there was little incentive to explore other energy options. Another reason was that the environmental movement hadn’t really begun until the 1970s and public awareness of the environmental costs of fossil fuels was not yet known.
Since the 1980’s wind energy has been implemented at a modest pace, and now wind turbines are dotted all across the nation. However, our shore lines have been untouched by wind energy, a drastic difference from northern Europe, China and Japan that have a combined 4.45 GW of installed wind energy potential with another 4.72 GW planned. The wind energy sector in the U.S. has struggled to break in to this market because three major factors: public opinion, an ironic lack of red tape, and perceived lack of financial viability.